Heller Electric Company completed the electrical work for the 356,000 square-foot Frank W. Ballou High School complex. The total construction cost was $124 million. The main building will achieve a LEED-Platinum rating due to:
- High-efficiency heating and cooling systems
- Low-E glass coatings
- Rooftop solar panels that will generate power for purchase by the local electric utility
The complex which serves as a school also boasts an outpatient health clinic, 800-student adult education space, a full-service automotive shop, a collegiate-level completion swimming pool and a rehearsal/recording area for Ballou’s nationally recognized marching band. The complex also includes a new football stadium and other outdoor buildings that had to be integrated into a 16.4-acre hillside site.
About The Electrical Alliance
The Electrical Alliance is a cooperative effort between electrical contractors and skilled craftsmen to provide quality products and services to customers and to set the standard for efficiency, productivity, and safety within the electrical industry. It is jointly sponsored by the National Electrical Contractors Association and Local 26, IBEW. To learn more, visit News & Press or follow the Electrical Alliance on Twitter @dcelec_alliance.
Contractor Info
Heller Electric Company, Inc.
P O Box 237 Route 381, Brandywine, MD, 20613-0237
(301) 372-6816 | brianheller@hellerelectric.com